For the board and IC

“What do I see between steering committees?”

You are not a user of this, and you should not have to be. What you get is a view that is current without anyone preparing it for you.

A standing view
Status and its trend over time, drawn from what the workstreams are actually recording rather than from a status call held to produce it.
The pack
Steering committee and board packs are generated from project data. The slide and the system say the same thing because the slide came from the system.
Your format
Upload previous board reports and the structure and house style are learnt from them, so the pack arrives looking like your papers rather than a vendor's template.
No chasing
Nobody spends the Monday before a meeting collecting slides from people who have already moved on to the next thing.
Read-only
A viewer role sees the position without being able to change it, so giving a non-executive access costs nothing and risks nothing.

How the packs are built

Report Centre assembles them from the project rather than from a template.

See how the packs are built